2022 November 28 continuing exploration of extent of greenhouse
2022 November 14 finding the edge of the greenhouse
2022 Nov 14 walled garden ceramic edging tiles
2022 DECEMBER 7 ZINC TANK END OF GLASSHOUSE WITH DIAGONAL WALL
2022 DECEMBER 7 TRIANGULAR WALL BASE IN GLASSHOUSE
2022 DECEMBER 7 EXCAVATING AT BASE OF HEATED WALL IN GLASSHOUSE WALLED GARDEN
2022 DECEMBER 7 6 PEOPLE EXCAVATING IN WALLED ARDEN
2022 DECEMBER 7 STUDENT RECORDING TRIANGULAR WALL
2023 February 13 glasshouse Norma and doris +1
2023 February 20 glasshouse metal heating pipes
2023 February 20 bracket found in centre of walled garden
2023 January 23 Norma and Maggie working at the back edge of the glass house in the walled garden
2023 january 23 Alan digging round the cap stone of the well walled garden
2023 January 23 cap stone over the well walled garden
2023 January 23 cap stone of well showing gap into well itself
2023 January 23 Alan photographing opening into well
2023 January 23 opening into well also showing metal plate fixed to under side of capstone
2023 January 23 close up of opening into well showing refelction in water
2023 January 23 looking into the well showing the sandstone inner wall
2022 November 28 base of glass jar
2022 November 28 glass jar
2022 October 31st digging in the greenhouse
2022 November 28 work on edge of glasshouse showing edging tiles
2022 August 8 Cammo walled garden
2022 early spring winter walled garden
2025 April 28 removing collapsed brick wall central area walled garden Anthony Gillian
2026 April 27 west end flag stones showing imperpection in flag
2026 April 27 top of boiler
2026 April 27 oerview of centre of conservatory from cellar, Michael, Ian, Duncan, Christine, Norma and Alan
2026 April 27 flagged floor of boiler
2026 April 27 cast iron pipe end in channel
2026 April 27 boiler whole thing
2026 April 27 boiler close up
2026 April 20th Overview of site from nw
2026 March 23 triangular cast iron grate in situ
2026 March 23 Overview of north side of site
2026 March 23 decorated traingular grate
2026 March 11 north side of conservatory possible work shed
2026 March 11 Jim down the hole at the south end tracking the terracotta pipes
2026 March 11 into the east end of the conservatory Alison Janet Norma Duncan Mark
2026 march 11 digging the ‘cellar’ Christine and Fiona
2026 January 26 Matthew Jackie and Ian working on the cellar
2025 December 9 overview of site from south entrance
2026 February 16 brick chute down into boiler
2025 November first finding of terracotta pipes in deep trench
2025 October 13 flags to east at top of cellar area
2025 November 24 Maggie emptying the barrow
2025 November 10 cast iron pipe and tap in cellar area
2026 February 9 Duncan Geoffrey and Mark with 2 others in the east side of the conservatory
2025 December 9 glass bottle
2026 March 11 clearing east end of east end
2025 3D photo of boiler house
2026 March 9 area behind central wall
2026 March c20 named brick
2026 January 26 tree roots in the cellar
2025 December 9 Christine covering a pond with safety tape
2025 December 9 cast iron cap or cover
2025 November 10 terracotta pipe in bed round flagstones in conservatory
2025 Sept 22 step entrance to conservatory from east side
2025 Sept 22 step entrance to conservatory from east side
2025 October top of possible cellar area
2025 October looking west across flagstone to corner of centre